3 Stage Gearbox Supplier: Build a Sizing RFQ

Estimate speed, torque and heat loss, then export a supplier RFQ draft. Confirm product ratings before ordering.

By LowBacklashGearbox · Published 9 November 2026 · Reviewed

Illustrative defaults — enable JavaScript for live estimates.

3-Stage Gearbox Supplier Sizing & RFQ Specifier

Decompose ratios (40:1 to 1000:1), calculate thermal loss & illustrative backlash shares, and export an RFQ draft for supplier review.

Output Speed
30 rpm
Motor Torque Demand
~5 Nm
Output Mechanical Power
1.4137 kW
Heat Loss Estimate
~157.08 W

Overall ratio 40:1 to 1000:1; 3-stage kinematic decomposition illustrates stage distribution.

Continuous duty output torque requirement (10–15,000 Nm). Shock/peak torque must be confirmed with supplier.

Motor drive speed (200–8,000 rpm). Governs stage 1 pitch line velocity and thermal generation.

Target torsional backlash (1–30 arcmin). Agree measurement torque, temperature and input-locking method with the supplier.

Live estimates use 90% assumed overall efficiency. Steady-state only; peak torque, bearing life and thermal capacity are not assessed. Review and export RFQ draft ↓

Quick Presets:

Multi-Stage Kinematic Decomposition & Backlash Allocation

Illustrative 3-stage kinematic distribution for 100:1 total ratio. Equal efficiency per stage is assumed. These ratios are illustrative, not verified tooth counts or catalog availability. Backlash shares assume equal intrinsic angular play.

Three-stage speed, torque, and backlash contribution distribution.
StageNominal RatioOutput SpeedOutput TorqueBacklash Contribution*
Stage 1 (Input)4:1750 rpm19.3098 Nm~3.2258% (Divided by i₂·i₃)
Stage 2 (Intermediate)5:1150 rpm93.217 Nm~16.129% (Divided by i₃)
Stage 3 (Output Stage)5:130 rpm450 Nm~80.6452% (Direct 1:1 Dominance)

* Backlash Dominance Law: In a serial multi-stage drive, output angular play is given by: Δθ_out ≈ Δθ₃ + Δθ₂/i₃ + Δθ₁/(i₂·i₃). Under equal intrinsic play, Stage 3 accounts for ~80.6452% of total output backlash.

* Inertia Reflection: Reflected load inertia to motor shaft is reduced by 1 / i² = 1 / 10,000 (reduction factor: 0.0001).

Kinematic Power & Backlash Transmission Flow
Servo Motor3000 rpmStage 1 (Input)Ratio 4:1High RPM input stageStage 2 (Mid)Ratio 5:1Torque SteppingStage 3 (Output)Ratio 5:1~80.6452% Backlash DominanceEqual-play assumptionOutput Load450 Nm30 rpm

Thermal Dissipation & Lubrication Evaluation

Thermal capacity: NOT ASSESSED

Estimated continuous heat dissipation: ~157.08 W at 90% assumed efficiency.

Thermal capacity not assessed. Heat loss alone cannot establish a safe housing or oil temperature. Ask the supplier for a continuous-duty rating or heat-balance test at your ambient temperature, mounting, airflow, duty cycle, and lubricant/seal specification.

Lubricant & seals:
Supplier to specify compatible oil or grease, viscosity, fill quantity and service interval for the actual duty.
Temperature limits:
No casing or sump temperature is calculated. Confirm the selected product limits; casing and oil sump readings are different.

Supplier 5-Gate Qualification & Deliverable Checklist

Agree application-specific deliverables with prospective suppliers before issuing purchase orders:

Gate 1: Application & design
Confirm the operating envelope before comparing prices.
  • Exact tooth-count ratio and motor-interface drawing
  • Continuous, peak and emergency torque ratings with duty limits
  • Gear capacity calculation with stated factors and assumptions
Gate 2: Material & metrology
Agree measurable requirements for the selected design.
  • Material and heat-treatment records against an approved specification
  • Gear inspection report with dimensions and agreed accuracy class
  • Housing, carrier and output-interface inspection against drawings
Gate 3: Assembly & lubrication
Review cleanliness and lubrication controls appropriate to the application.
  • Assembly and contamination-control plan
  • Supplier-approved lubricant, fill quantity and maintenance interval
  • Seal material compatibility and installation controls
Gate 4: Performance verification
Test the assembled unit under agreed conditions.
  • Backlash test against target 5 arcmin at agreed torque and temperature
  • Noise test at 3000 rpm with agreed distance and load
  • Thermal equilibrium report at application duty; ingress test evidence if IP protection is required
Gate 5: Commercial handover
Resolve acceptance, traceability and support terms.
  • Batch conformity records and traceability
  • Transport packaging and corrosion protection plan
  • Written warranty, exclusions, spare parts and change-control agreement

Generated Supplier RFQ Specification Package

Draft only: complete the missing operating conditions before requesting a binding specification.

Send RFQ via Engineering Email

Download the RFQ first, then attach it in your email client. The email link includes a short parameter summary; it does not send automatically.

1. What to establish before selecting a supplier

Decision summary: calculation, evidence and next action
DecisionWhat is supportedNext action
Stage countRatio alone does not fix the number of stages; catalog families differ.Request the exact model, ratio and stage count.
BacklashSerial attenuation explains the equal-play illustration; it does not certify assembled accuracy.Request a measured unit-level test at agreed conditions.
Continuous dutyPower loss estimates heat generation. Thermal capacity needs a separate heat balance.Request application-specific continuous-duty evidence.
InterfacesA dimensional interface standard does not establish load capacity.Confirm the motor fit and actual radial, axial and moment loads.

Basis: the tool equations below, Neugart PLE — product-specific ratio and stage data, ISO 1328-1:2013 — gear flank tolerance classification, ISO/TR 14179-1:2001 — thermal capacity reference conditions and ISO 9409-1:2004 — robot mechanical interface plates. No supplier is qualified or endorsed by this page.

2. Compare architectures against the application

This is a shortlist framework. Packaging and gear geometry suggest candidates; a product datasheet and application review establish suitability.

Architecture tradeoffs — qualitative, not guaranteed product specifications
ArchitectureCandidate useChecks before selection
Coaxial planetaryCompact motor-to-load alignmentBacklash, carrier stiffness, ratio availability and bearing loads
Inline helicalIndustrial drives with space for a larger housingActual continuous thermal rating, mounting and lubrication
Bevel-planetaryMotor must turn through 90 degreesInput bevel geometry, combined losses, noise and shaft alignment
Parallel spurSimple gearing where packaging and noise allowMeasured noise, accuracy and full load spectrum
Two-stage alternativeRequested ratio is available in fewer stagesCompare efficiency, length, backlash and torque in the same duty

Neugart PLE — product-specific ratio and stage data illustrates why ratios and stage counts should be read by product family. The tool accepts 40:1–1000:1 for calculation; that range is not a promise of catalog availability.

3. Reproduce the sizing method

Steady-state method, units and boundaries
QuantityEquationBoundary
Output speed (rpm)n_out = n_in / iExact nominal ratio; no transient acceleration
Required motor torque (Nm)T_in = T_out / (i × η)η is assumed overall efficiency; no starting or shock torque
Output power (kW)P_out = T_out × n_out × 2π / 60000Mechanical output at the entered operating point
Heat generation (W)P_loss = 1000 × P_out × (1/η − 1)Not a temperature or cooling-capacity prediction
Reflected load inertiaJ_ref = J_load / i²Excludes gearbox inertia, compliance and control dynamics
Stage torqueT_k = T_(k+1) / (i_(k+1) × η_stage)Equal η_stage = cube root of η; actual losses differ

These are mechanical speed, torque and power identities with the stated assumptions, not a gear strength model. At the default 100:1, 450 Nm and 3000 rpm, output is 30 rpm, motor torque is 5 Nm and heat generation is about 157.1 W at 90% efficiency. The illustrative 4 × 5 × 5 split preserves the ratio; only tooth-count design can establish manufacturability.

4. Interpret backlash without overstating precision

For three serial stages, with each Δθ measured at its own stage output: Δθ_out ≈ Δθ₃ + Δθ₂/i₃ + Δθ₁/(i₂ × i₃). With equal intrinsic play and a 4 × 5 × 5 split, the weights are 0.04, 0.20 and 1.00: about 3.2%, 16.1% and 80.6% of the sum.

Different stage clearances change those percentages. Compliance under load, hysteresis and controller positioning error are separate quantities. A target in arcminutes is a requirement, not a computed product capability.

ISO 1328-1:2013 — gear flank tolerance classification concerns individual gear flank deviations. Ask for an assembled-unit backlash report with test torque, temperature, input restraint and direction reversal. P0/P1/P2 labels vary by supplier and are not used here as universal classes.

5. Audit material and geometry evidence

Evidence to request instead of universal material or tolerance claims
EvidenceWhat to identifyWhat it does not prove
Material and heat treatmentApproved grade, delivery condition, heat/lot ID, case-depth and hardness requirementsA steel designation alone does not establish fatigue capacity
Gear inspectionModule, diameter, face width, measured deviations, standard edition and agreed classOne class does not mean the same micrometre limit for every gear
Carrier and housing CMMDatum scheme, position/parallelism/runout tolerances from the drawingOne pin position number cannot determine mesh load sharing
Gear capacity calculationGeometry, load spectrum, material condition and influence factorsA nominal output torque alone is insufficient to derive safety factors

ISO 1328-1:2013 — gear flank tolerance classification and ISO 6336-1:2019 — gear capacity principles and influence factors provide the relevant classification and load-capacity scope. This page has not verified a supplier-specific tolerance budget or design calculation.

6. Separate bearing life from gearbox reliability

Basic roller-bearing rating life under constant load and speed is L10h = 10⁶/(60n) × (C/P)^(10/3), with C and P in matching load units and n as the applicable bearing rotational speed. Planet-bearing relative speed must be derived from the actual mechanism.

SKF — basic bearing rating life and ISO 281 model describes L10 as a 90% reliability measure and explains why lubrication and contamination change service life. It is not gearbox MTBF. This tool has no bearing selection, load geometry or relative speed input and therefore does not estimate bearing hours, Hertz stress or a life-limiting stage.

Ask for bearing part numbers, equivalent loads, relative speeds, lubrication assumptions and static checks at peak load. If those are unavailable, retain life as unknown before accepting a production design.

7. Qualify the supplier through five evidence gates

Five steps from requirement to batch releaseGate 1RequirementsGate 2Design evidenceGate 3Sample testsGate 4AcceptanceGate 5Batch release
Proposed buyer workflow, not a certification or supplier ranking.
Proposed acceptance workflow — agree deliverables in the RFQ
GateEvidenceHold point
1. Application and designDuty profile, load cases, exact ratio, motor and output drawingsStop if ratings do not cover the entered operating envelope
2. Process and metrologyMaterial/heat-treatment traceability and drawing-based inspectionResolve missing acceptance limits before approving the sample
3. AssemblyLubrication, fill, cleanliness and seal controlsConfirm compatibility with orientation and environment
4. Sample performanceBacklash, thermal, noise and applicable ingress evidenceUse agreed load, speed, test duration and pass criteria
5. Batch releaseConformity, change control, lead time, warranty and sparesResolve exclusions and inspection ownership in writing

An ISO 9001, IATF 16949 or AS9100 certificate describes a management-system scope; it does not itself certify this gearbox rating. Check the certificate scope and agree product evidence separately. These gates are our proposed procurement method, not a standard-mandated certification sequence.

Export your RFQ and request these acceptance records

8. Heat generation is not thermal capacity

Two housings with identical calculated losses can reach different temperatures. Ambient, mounting conduction, exposed area, airflow, enclosure, lubricant and duty cycle determine heat rejection. The tool marks thermal capacity as NOT ASSESSED for every operating point.

ISO/TR 14179-1:2001 — thermal capacity reference conditions describes a mineral-oil heat-balance method with reference ambient and oil sump temperatures of 25°C and 95°C, plus modifiers. It does not create a universal 80°C or 85°C casing limit, nor a 150 W or 400 W cooling threshold. Grease-filled servo units and other conditions require product-specific evidence.

Thermal evidence still needed after calculating watts
Missing conditionRequest from supplierDecision use
Ambient, mounting and airflowThermal rating or equilibrium test for the installationConfirm continuous operation without exceeding product limits
Lubricant and sealsCompatible product, viscosity/fill, temperature and maintenance limitsAvoid selecting grease/oil or seals from a generic rule
Cycle and transientsCycle-average loss and peak torque/temperature checksA lower average temperature does not permit unlimited peak torque

9. Check interfaces and application mismatch

ISO 9409-1:2004 — robot mechanical interface plates defines an interface plate system without assigning load-carrying ranges. Confirm the actual allowable Fr, Fa and bending moment at the load location, plus coupling fit, motor pilot, insertion depth and fasteners.

A smooth shaft has no keyway: DIN 6885 key forms do not define it. Clamping and shrink-disc connections still need manufacturer torque, surface, fit and installation requirements. For a wheel or pulley with overhung load, attach the load-offset drawing; the tool cannot validate the bearings or shaft.

10. Worked RFQ examples — illustrative, not customer results

All three use assumed 90% overall efficiency, steady load and the same power equations. These are reproducible planning examples without verified product capacity, prices or field performance.

Example assumptions, calculated results and release conditions
Application and inputsCalculated resultWhat must be verified
Servo rotary axis: 100:1, 450 Nm, 3000 rpm30 rpm output; 5.00 Nm motor torque; 157.1 W lossBacklash at agreed torque, servo tuning, peak cycle and interface
Right-angle axis: 160:1, 800 Nm, 3000 rpm18.75 rpm output; 5.56 Nm motor torque; 174.5 W lossActual bevel ratio, combined efficiency and overhung loads
Continuous drive: 500:1, 4500 Nm, 1500 rpm3 rpm output; 10.00 Nm motor torque; 157.1 W lossContinuous thermal rating, lubrication, starting torque and bearings
3 stage gearbox supplier tool showing a 100:1 RFQ draft with 30 rpm output and 157.1 W assumed heat loss
Original browser capture, 9 November 2026: 100:1, 450 Nm, 3000 rpm and assumed 90% overall efficiency. Reproduce with Reset defaults. Software execution evidence; no physical test, supplier quote or customer endorsement is implied.

Use the matching preset, compare the live output, then export the RFQ draft. A calculated operating point becomes a candidate only after supplier evidence covers the missing release conditions.

11. Compare costs and mitigate procurement risk

Risk, commercial impact and minimum mitigation
RiskCost or failure exposureMinimum mitigation
Misuse of estimatesOrdering a product against calculated torque without rating evidenceHold purchase approval until duty, peak load and thermal checks pass
Scenario mismatchA compact precision unit may not suit long continuous duty or wheel loadsCompare a larger housing, separate load bearing or alternate topology
Low quoted unit priceTooling, qualification, shipping, spares and downtime may dominateCompare identical quantities, tests and named delivery terms
Unverified savingsNo quotes or comparable field data support a percentage savingMark price and downtime unknown until documented; use sensitivity ranges
Delivery responsibilityCustoms, tax registration, carrier handover and claims may be unclearRecord the named place, rule, edition and responsible parties

Use TCO = purchase + tooling + qualification + logistics/import charges + maintenance + expected downtime over a defined horizon. No market prices or supplier tiers are asserted here. For container and multimodal moves, ICC — Incoterms 2020 checklist, 2024 update supports considering FCA; FOB/CIF have a water-transport scope. Confirm jurisdiction-specific customs and tax execution separately.

12. Sources, date and known limitations

Source scopes and linked public guidance checked on . ISO catalog abstracts establish the listed scope; they do not substantiate product-specific tolerance values, bearing life, supplier pricing or universal thermal limits. Full standards and a qualified application review are required for design acceptance.

Known: the entered operating point and the equations shown above. Assumed: overall efficiency, equal per-stage efficiency, illustrative ratios and equal intrinsic backlash. Unknown: tooth geometry, actual stage losses/play, housing heat transfer, load spectrum, bearing selection, seal compatibility, verified supplier capability, price and lead time. The target lead times are buyer requests, not delivery promises.

13. Questions before sending the RFQ

Sizing & model limits

Does a high ratio always require three stages?

No. Stage count depends on topology, tooth geometry and product family. Ask suppliers for the exact ratio and stage count; compare a two-stage alternative where available rather than applying a universal ratio cutoff.

What does this tool calculate?

Steady-state output speed, required input torque, mechanical power, heat generation and an illustrative three-stage split. It does not select a rated product or assess emergency torque, thermal capacity, fatigue life or safety.

Are the proposed stage ratios manufacturable?

Not necessarily. Their product matches the requested total ratio, but integer tooth counts, interference, planet spacing, strength and catalog availability still require supplier verification.

Why does Stage 3 have the largest backlash share?

The serial model divides upstream stage-output angular play by downstream ratios. The displayed percentages assume equal intrinsic play in all three stages. Actual assembled backlash must be measured and can have a different distribution.

Does a high ratio guarantee stable servo control?

No. Load inertia reflects through the ideal ratio squared, but gearbox inertia, compliance, friction, encoder location, resonances and controller tuning also affect stability.

Evidence & acceptance

Does an ISO 1328 accuracy grade guarantee assembled backlash?

No. It classifies individual gear flank deviations. Assembly clearances, bearings, housing and preload also matter. Agree an assembled-unit backlash test with torque, temperature and input-locking conditions.

Can carrier pin tolerance alone determine mesh load sharing?

No. Carrier and gear stiffness, errors, floating members, planet count and load all contribute. Ask for a design-specific load-sharing calculation rather than converting one position tolerance into a universal factor.

Is bearing L10 life the gearbox MTBF?

No. Basic rating life is a statistical rolling-bearing fatigue measure at 90% reliability. Gearbox service life also depends on gears, seals, lubrication, contamination, loading and assembly.

Thermal & interfaces

Can heat loss in watts predict a safe temperature?

No. Ambient temperature, housing heat transfer, mounting, airflow, duty and cooling are also needed. The tool therefore reports heat generation and marks thermal capacity as not assessed.

Does ISO/TR 14179-1 set a universal casing temperature limit?

No. Its stated reference heat-balance conditions include 25°C maximum ambient and 95°C oil sump temperature for mineral-oil gear drives, with modifiers for other conditions. These are not a universal casing, grease or seal limit.

Does an ISO 9409-1 flange establish moment capacity?

No. The standard addresses mechanical interface dimensions, designation and marking. The gearbox supplier must separately rate radial, axial and moment loads at the application load position.

Does a leak test prove IP65 or IP66 protection?

No. A production leak test can support process control, but the claimed ingress rating needs applicable dust and water test evidence for the actual enclosure and installation.

Commercial & next steps

How should I compare supplier prices?

Use the same ratio, duty, acceptance tests, quantity and named delivery place. Separate unit price, tooling, qualification, freight, import charges, spares and expected downtime. This page supplies a comparison method, not verified supplier quotes.

Which delivery rule should container shipments use?

Consider FCA at a named delivery point for container or multimodal transport. FOB and CIF are sea or inland-waterway rules. Confirm customs responsibilities and local feasibility with your logistics provider; DDP does not remove all execution risk.

What happens to my data when I use the tool?

Calculations and text exports run in your browser. Copy uses browser clipboard permission, download saves a text file, and the email link opens your mail client with a short summary. You choose whether to send and must attach the downloaded RFQ yourself.

What should I do if my application is outside the input range?

Do not clamp your requirement to the nearest allowed value. Send the actual torque, speed, ratio, cycle profile, environment and interface drawing for a manual supplier review. The input limits define this tool, not the limits of gearbox technology.

14. Complete the draft and request evidence

Add peak and emergency torque, cycle profile, ambient temperature, motor/output drawings, load position and required ingress rating. Agree test limits, named delivery place, quantity and warranty before comparing offers.

For an out-of-range application or incomplete specification, email [email protected] with the actual operating conditions. Feasibility, quotations and delivery dates require confirmation.